• Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
No Result
View All Result
Contact us
Construction Front | Industry Knowledge Hub, News Portal
  • Engineering
  • News
  • Knowledge Hub
  • Resources
  • Contact Us
  • About us
Construction Front | Industry Knowledge Hub, News Portal
  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
No Result
View All Result
Contact us
Construction Front | Industry Knowledge Hub, News Portal
No Result
View All Result
Home News
ACCIONA Reaches Financial Close for Casablanca Desalination Plant PPP

ACCIONA Reaches Financial Close for Casablanca Desalination Plant PPP

Construction Front Team by Construction Front Team
May,2025
in News
0 0
0
51
SHARES
468
VIEWS
Share on EmailShare on TwitterShare on LinkedinShare on Facebook

ACCIONA, in partnership with Green of Africa and AfriquiaGaz, has officially reached financial close for the Casablanca desalination plant — a major public-private partnership (PPP) set to become both Africa’s largest desalination plant and the world’s largest powered entirely by renewable energy.

The company has also recently reached significant financing milestones in Australia, with the commercial and financial closure for Central West Orana Transmission Line project PPP, and in Peru, with the acquisition of  Machupichu–Quencoro–Onocora–Tintaya transmission line project in southern area of the Country.

Casablanca Desalination Plant PPP - Project Details

Located in Sidi Rahal, within the Greater Casablanca area, the facility will provide 300 million cubic metres of desalinated water per year, responding to the growing water needs of Morocco’s economic capital and surrounding regions. Once operational, the plant is expected to serve 7.5 million people and support agricultural activities through the supply of up to 50 million cubic metres for irrigation.

Under the PPP framework, ACCIONA will take the lead on the design, build, financing, operation, and maintenance (DBFOM) of the plant for a 27-year term, in close collaboration with Morocco’s Office National de l’Électricité et de l’Eau Potable (ONEE).

The facility will employ reverse osmosis technology and draw its energy exclusively from the 360 MW Bir Anzarane wind farm, of which nearly 47% of capacity will be dedicated to powering the plant. This full reliance on renewables aligns the project with Morocco’s broader sustainability goals, setting a precedent for future infrastructure developments on the continent.

ACCIONA Reaches Financial Close for Casablanca Desalination Plant PPP
ACCIONA and partners have reached financial close on the Casablanca desalination plant, a €613 million PPP project set to become Africa’s largest and the world’s biggest powered entirely by renewable energy. (Source: Acciona.com)

Project Timelines and Regional Impact

Construction is expected to be completed by 2028, positioning the Casablanca desalination plant as a key infrastructure asset in the region. It builds upon ACCIONA’s long-standing involvement in North African water projects, including the Fouka plant in Algeria, delivered in 2007 and still under operation.

The plant will supply potable water to Casablanca, Settat, Berrechid, and Bir Jdid, among other neighboring communities. In doing so, it will provide a vital buffer against water scarcity, a growing concern across the region, and contribute meaningfully to local economic development.

Casablanca Desalination Plant - Investment and Financial Structure

The total investment in the project stands at 6.5 billion Moroccan dirhams (approximately €613 million), with 80% structured as debt and 20% as equity. Upon financial close, the Acciona-led consortium secure funds from a mix of national and international lenders and institutions, demonstrating strong market confidence. Key financial partners include:

  • FIEM via ICO

  • Société Générale, backed by Cesce through Spain’s Green Investment Policy

  • Attijariwafa Bank

  • Banque Centrale Populaire

  • Bank of Africa

  • Caixa

  • COFIDES

This strong financial backing reflects not only the strategic importance of the plant for Morocco’s water security, but also the project’s attractiveness to institutions promoting sustainable development.

What is a public-private partnership (PPP) contract?

Public-Private Partnerships (PPPs) are typically long-term contracts between a government institution and a private entity for the delivery of public infrastructure and services. These services—such as hospitals, water supply systems, sewage treatment, prisons, and roads—are traditionally provided by the public sector.

In a PPP arrangement, the private party is usually responsible for designing, building, financing, operating, and maintaining the infrastructure. This model transfers significant risks to the private sector, particularly in areas such as project development, construction, and long-term operation and maintenance (read more on Public Private Partnerships (PPPs): What are they? How they Work?)

Key features of PPP contracts.

Related Project and News

  • Acciona-Jacobs JV to deliver Alkimos Desalination Plant in Western Australia
  • Acciona wins wastewater treatment plant (WWTP) contract in Spain.
  • SLB-Sener-ACCIONA JV Awarded FEED Contract for AEB ’s Aurora Carbon Capture Project
  • ACCIONA and Eiffage to Deliver Madrid’s New Formula 1 Urban Circuit 
Source: acciona.com
Tags: African Market NewsDesalination Plantfinancial closeinfrastructure investingMarrocoPPPproject milestoneWater
Previous Post

Aypa Power Reaches Financial Close on $535 Million for California Hybrid Solar and Storage Project

Next Post

Bechtel Appointed as Delivery Partner for King Salman International Airport Expansion in Riyadh

Construction Front Team

Construction Front Team

Construction Front is run by people passionate about the construction industry and looking forward to engaging with professionals in the sector. We strive to produce the best content in the market and would love to stay connected and hear your feedback!

Related Posts

CIP and PensionDanmark Launch Plexar Energy to Accelerate Industrial Microgrid Deployment
News

CIP and PensionDanmark Launch Plexar Energy to Accelerate Industrial Microgrid Deployment

by Construction Front Team
June,2025
GE Vernova to Supply Gas Turbines to Técnicas Reunidas–Orascom JV for 3GW Qurayyah IPP Expansion
News

GE Vernova to Supply Gas Turbines to Técnicas Reunidas–Orascom JV for 3GW Qurayyah IPP Expansion

by Construction Front Team
May,2025
DIF-Backed Diverso Energy and Mattamy Homes Announce Strategic Geothermal Partnership in Canada
News

DIF-Backed Diverso Energy and Mattamy Homes Announce Strategic Geothermal Partnership

by Construction Front Team
May,2025
ABB Launches Battery Energy Storage Systems-as-a-Service (BESSaaS)
News

ABB Launches Battery Energy Storage Systems-as-a-Service (BESSaaS)

by Construction Front Team
May,2025
Bechtel receives Full NTP for Mammoth Solar facility in Indiana
News

Bechtel receives Full NTP for Mammoth Solar facility in Indiana

by Construction Front Team
May,2025
Next Post
Bechtel Appointed as Delivery Partner for King Salman International Airport Expansion

Bechtel Appointed as Delivery Partner for King Salman International Airport Expansion in Riyadh

What is a Power Purchase Agreement (PPA)

Power Purchase Agreements (PPAs): What They Are and Their Relevance to the Construction Sector

Port of Vancouver Confirms Procurement Process for Roberts Bank Terminal 2 Construction

Port of Vancouver Confirms Procurement Process for Roberts Bank Terminal 2 Construction

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

I agree to the Terms & Conditions and Privacy Policy.

Stay Connected

Construction front 345 345 advertise
LinkedIn Twitter Youtube Instagram Facebook

All about the construction world: the latest industry news and trends, practical knowledge, and unique tips to help you on your projects.

Site Map

  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
  • Contact Us
  • About us

Recent Posts

Integrated Project Delivery (IPD) - Definition

Integrated Project Delivery (IPD): What is it?

June,2025
CIP and PensionDanmark Launch Plexar Energy to Accelerate Industrial Microgrid Deployment

CIP and PensionDanmark Launch Plexar Energy to Accelerate Industrial Microgrid Deployment

June,2025

Copyright © 2023 ConstructionFront.Com | Affiliate Disclosure | Privacy Policy | Terms & Conditions

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources

Copyright © 2023 ConstructionFront.Com | Affiliate Disclosure | Privacy Policy | Terms & Conditions

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.

Privacy Policy - Terms and Conditions