• Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
No Result
View All Result
Newsletter
Construction Front | Industry Knowledge Hub, News Portal
  • Engineering
  • News
  • Knowledge Hub
  • Resources
  • Contact Us
  • About us
Construction Front | Industry Knowledge Hub, News Portal
  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
No Result
View All Result
Newsletter
Construction Front | Industry Knowledge Hub, News Portal
No Result
View All Result
Home News
Reeves Plains Energy Hub

GenusPlus Secures $105 Million Contract from Alinta Energy for Reeves Plains BESS Project in South Australia

by Construction Front Team
September,2025
in News
0 0
0
100
SHARES
910
VIEWS
Share on EmailShare on TwitterShare on LinkedinShare on Facebook

GenusPlus Group Ltd has been awarded a contract by Alinta Energy to design, construct, and commission a major battery energy storage system (BESS) in Reeves Plains, South Australia.

The $105 million project includes the development of a 250 MW, four-hour battery system and associated infrastructure, connecting to the National Electricity Market through ElectraNet’s 275 kV transmission network.

The project forms part of Alinta Energy’s broader Reeves Plains Energy Hub and is expected to engage approximately 100 personnel during construction, with a strong focus on local procurement and workforce participation.

Reeves Plains - Energy Hub and BESS Project

The Reeves Plains Battery Energy Storage System (BESS) will be located approximately 50 minutes north of Adelaide and forms a core component of the broader Reeves Plains Energy Hub — a significant development aimed at enhancing South Australia’s energy security and grid stability.

The Energy Hub comprises two key elements: a utility-scale battery and a proposed gas-fired power station. The BESS, to be delivered in two stages, will provide four hours of electricity storage with an initial capacity of 250 MW. Once operational, it will have the ability to power approximately 300,000 households during peak demand periods by storing excess renewable energy and dispatching it when most needed.

Complementing the BESS, the gas-fired facility is designed to deliver up to 300 MW of fast-start, on-demand electricity, supporting system reliability during periods of volatility or shortfalls in renewable generation.

Reeves Plains Energy Hub - BESS Alinta Energy
The Reeves Plains Energy Hub, located north of Adelaide, features a 250 MW battery system and a proposed 300 MW gas-fired plant. This hybrid facility will enhance grid stability by combining renewable energy storage with fast-start generation capability (Source: alintaenergy.com.au)

As Australia continues its transition toward a net-zero emissions future, the Reeves Plains Energy Hub offers a hybrid solution that combines storage and dispatchable generation to strengthen the resilience of the National Electricity Market (NEM).

The BESS will feature approximately 194 battery modules and 87 inverters, along with supporting infrastructure including a substation, water storage facilities, an office and control room, and vegetated site screening.

Genus' scope of work and contract details

It is understood that GenusPlus has been engaged to deliver the full EPC Contract for the Reeves Plains Battery Energy Storage System. The company will be responsible for the end-to-end delivery of all supporting infrastructure required to bring the 250 MW, four-hour BESS online and integrated with South Australia’s high-voltage transmission network.

Key elements of GenusPlus’ scope include:

  • Detailed engineering and design of the BESS and associated infrastructure

  • Procurement and supply of battery modules, inverters, and ancillary equipment

  • Civil works, including site preparation, access, drainage, and structural foundations

  • Mechanical and electrical installation across all systems

  • Construction of a new 275 kV switchyard and associated grid connection works

  • Integration with ElectraNet’s high-voltage network

  • Testing, commissioning, and performance validation

Approximately 100 personnel will be engaged during the construction phase, with GenusPlus committed to maximising local workforce participation and South Australian content throughout delivery.

Genus’ Managing Director David Riches said:

“This flagship project represents a significant step forward in our strategic growth within the renewable energy sector. It underscores the strength of our long-standing client relationships and our proven track record for safe, reliable delivery. We are proud to be at the front line of building the projects that keep this country moving,growing & connected; and we look forward to continuing this valued collaboration with Alinta Energy.”

Related Project and News 

  • Central-West Orana PPP Reaches Financial Close for the Australia’s First Renewable Zone
  • CIP Begins Construction on 240 MW / 960 MWh Battery Energy Storage System in Australia
  • Genus Wins $65 Million Contract for Merredin BESS and Substation in WA 
  • UGL Secures Contract for Clean Energy Infrastructure in Western Australia
Source: genus.com.au and alintaenergy.com.au
Tags: AustraliaAustralian & NZ market newsBESScontract awardEPCrenewablesSouth Australia
Previous Post

Cheniere Reaches FID for Corpus Christi Midscale LNG Expansion and Issues Notice to Proceed to Bechtel

Next Post

Balfour Beatty-led JV signs Alliance Agreement to deliver Civil Works for Sizewell C Nuclear Plant

Construction Front Team

Construction Front is run by people passionate about the construction industry and looking forward to engaging with professionals in the sector. We strive to produce the best content in the market and would love to stay connected and hear your feedback!

Related Posts

Red Oak Campus - Data Centre Map
News

DataBank secures $2 billion financing for Red Oak data centres in Dallas

by Construction Front Team
April,2026
alligator creek solar farm - aerial view
News

Heelstone reaches financial close and starts construction on Alligator Creek and Murch solar projects in the U.S.

by Construction Front Team
April,2026
Williams kicks off construction on NESE Project in the U.S. Northeast
News

Williams kicks off construction on NESE Project in the U.S. Northeast

by Construction Front Team
April,2026
BESS - Battery Energy Storage Systems
News

CIP commences construction on 1,500 MWh Patache BESS project in Chile

by Construction Front Team
April,2026
Technip Energies receives substantial authorization to advance Commonwealth LNG ahead of FID
News

Technip Energies receives substantial authorization to advance Commonwealth LNG ahead of FID

by Construction Front Team
April,2026
Next Post
Sizewell C nuclear plant

Balfour Beatty-led JV signs Alliance Agreement to deliver Civil Works for Sizewell C Nuclear Plant

The new bridge over the Pannerdens Kanaal is expected to open to traffic in 2031, as part of the ViA15 project

Hochtief-BESIX Led JV Secures €1.2 Billion Road PPP Contract for ViA15 Project in the Netherlands

Skanska-FlatironDragados JV Awarded $1 Billion Contract for Long Bridge North Project

Skanska-FlatironDragados JV Awarded $1 Billion Contract for Long Bridge North Project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

I agree to the Terms & Conditions and Privacy Policy.

Stay Connected

Join our newsletter!

Newsletter

Newsletter

Stay at the front of the construction industry with the latest news, market trends, and project insights — delivered by ConstructionFront.com

Name
Enter your email address
LinkedIn Twitter Youtube Instagram Facebook Flirk

All about the construction world: the latest industry news and trends, practical knowledge, and unique tips to help you on your projects.

Site Map

  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
  • Contact Us
  • About us

Recent Posts

Red Oak Campus - Data Centre Map

DataBank secures $2 billion financing for Red Oak data centres in Dallas

April,2026
pre_construction_services_contract_infographic_900x600pre_construction_services_contract_infographic_900x600

How a Pre-Construction Services Contract (PCSA) Works (And When to Use It)?

April,2026

Copyright © 2023 ConstructionFront.Com | Affiliate Disclosure | Privacy Policy | Terms & Conditions

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources

Copyright © 2023 ConstructionFront.Com | Affiliate Disclosure | Privacy Policy | Terms & Conditions

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.

ConstructionFront.com - Newsletter!

Stay at the front of the construction industry with the latest news, market trends, and project insights — delivered by ConstructionFront.com

Name
Enter your email address

Thanks, I’m not interested

Privacy Policy - Terms and Conditions