• Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
No Result
View All Result
Newsletter
Construction Front | Industry Knowledge Hub, News Portal
  • Engineering
  • News
  • Knowledge Hub
  • Resources
  • Contact Us
  • About us
Construction Front | Industry Knowledge Hub, News Portal
  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
No Result
View All Result
Newsletter
Construction Front | Industry Knowledge Hub, News Portal
No Result
View All Result
Home News
BESS

Genus to Deliver 100MW/200MWh Wagerup BESS for Alinta Energy in Western Australia

by Construction Front Team
September,2025
in News
0 0
0
147
SHARES
1.3k
VIEWS
Share on EmailShare on TwitterShare on LinkedinShare on Facebook

GenusPlus Group LtdĀ  has been selected by Alinta Energy to complete the delivery of the 100MW/200MWh Battery Energy Storage System (BESS) at the Wagerup Power Station in Western Australia’s South West.

Genus has been awarded the Balance of Plant (BoP) Works Contract, valued at approximately $50 million, which will integrate with existing high-voltage infrastructure to enhance the stability of the South West Interconnected System (SWIS) and provide backup capacity when required.

The SWIS is Western Australia’s main electricity grid, serving more than 1.1 million customers across Perth, the South West, Kalgoorlie, and Geraldton. It faces increasing challenges as renewable penetration rises, making grid-scale batteries critical for balancing supply and demand and mitigate potential technical issues associated with energy generation, such as curtailment.Ā 

Wagerup BESS - Project Details

The Wagerup BESS is part of Alinta Energy’s broader investment strategy in energy storage to support grid stability and system resilience as renewable generation increases across the SWIS.

The battery will be located at Wagerup Power Station, a dual-fuel (gas and distillate) facility commissioned in 2007 with a capacity of 380 MW. By collocating the battery with existing generation assets and high-voltage infrastructure, the project reduces connection costs, accelerates delivery, and ensures efficient integration into the grid.

In 2023, Alinta announced that Shanghai Electric Power Design Institute Co. Ltd (SEPD) and Sunterra Pty LtdĀ would provide the battery system for the project, marking a significant step in securing supply chain readiness and ensuring compatibility with WA’s system requirements.

It is understood that Genus will be responsible for the Balance of Plant scope that will enable construction completion and commissioning. Approximately 100 personnel will be engaged to complete the project, with a strong emphasis on local content from Western Australia.

BESS
The 100MW/200MWh Wagerup BESS will be colocated with Alinta Energy’s 380 MW Wagerup Power Station in WA. The project will support SWIS grid stability, reduce connection costs, and enable efficient integration of renewable energy, with GenusPlus delivering Balance of Plant works and strong local workforce participation.

What is Balance of Plat Works?

The Balance of Plant (BoP) contract typically encompasses all supporting infrastructure required to integrate the battery system into the grid, aside from the battery units themselves. Generally, the BoP works include:

  • Civil works such as foundations and access roads

  • Electrical systems including transformers, switchgear, and cabling

  • Protection, control, and monitoring systems

  • Commissioning and integration with existing grid infrastructure

This contract type is a common feature of large-scale energy projects, where specialised contractors deliver the supporting systems that ensure safe, reliable, and timely operation. Genus’s selection for this role reflects its proven capability in delivering BoP contracts across the energy sector in Australia.

Why Locate Batteries Near Power Stations?

Battery systems are often colocated with existing power stations to leverage existing grid infrastructure and reduce the need for new transmission assets. This approach lowers project costs and shortens connection timelines.

It also ensures that storage can directly complement thermal generation, providing rapid backup capacity when renewable output fluctuates.Ā In markets like Western Australia, where renewable penetration is increasing, colocated batteries also help reduce curtailment of wind and solar generation, enabling more efficient use of available renewable resources.

Leadership Comments on the Contract

Genus Managing Director David Riches said the company was pleased to be entrusted with another grid-critical project.

ā€œWe’re proud to have been trusted by Alinta to complete this important BESS project safely, efficiently and in a timely manner,ā€ Riches said.


ā€œThis award reflects the reputation Genus has developed in a relatively short period of time. Every successful delivery reinforces our position as a partner of choice in the battery energy storage space — and this project is a testament to the strength of our people, our client partnerships and our purpose.ā€

Related Project and News

  • GenusPlus Secures $105 Million Contract from Alinta Energy for Reeves Plains BESS Project in South Australia
  • Genus Wins $65 Million Contract for Merredin BESS and Substation in WA
  • ABB Launches Battery Energy Storage Systems-as-a-Service (BESSaaS)
  • Copenhagen Infrastructure Partners (CIP) Begins Construction on 240 MW / 960 MWh Battery Energy Storage System in AustraliaĀ 
Source: genus.com.au
Tags: AustraliaAustralian & NZ market newsBESScontract awardenergyrenewablesWestern Australia
Previous Post

Curtailment in Renewable Energy Projects: What is it?

Next Post

Hyundai E&C to Deliver ā€˜K-Housing’ in New Zealand via Early Contractor Involvement (ECI) Contract

Construction Front Team

Construction Front is run by people passionate about the construction industry and looking forward to engaging with professionals in the sector. We strive to produce the best content in the market and would love to stay connected and hear your feedback!

Related Posts

Red Oak Campus - Data Centre Map
News

DataBank secures $2 billion financing for Red Oak data centres in Dallas

by Construction Front Team
April,2026
alligator creek solar farm - aerial view
News

Heelstone reaches financial close and starts construction on Alligator Creek and Murch solar projects in the U.S.

by Construction Front Team
April,2026
Williams kicks off construction on NESE Project in the U.S. Northeast
News

Williams kicks off construction on NESE Project in the U.S. Northeast

by Construction Front Team
April,2026
BESS - Battery Energy Storage Systems
News

CIP commences construction on 1,500 MWh Patache BESS project in Chile

by Construction Front Team
April,2026
Technip Energies receives substantial authorization to advance Commonwealth LNG ahead of FID
News

Technip Energies receives substantial authorization to advance Commonwealth LNG ahead of FID

by Construction Front Team
April,2026
Next Post
Hyundai E&C to Deliver ā€˜K-Housing’ in New Zealand via Early Contractor Involvement (ECI) Contract

Hyundai E&C to Deliver ā€˜K-Housing’ in New Zealand via Early Contractor Involvement (ECI) Contract

STRABAG and Siemens Energy Begin Construction of OMV’s 140 MW Green Hydrogen Plant in Austria

STRABAG and Siemens Energy Begin Construction of OMV’s 140 MW Green Hydrogen Plant in Austria

Richmond Valley Solar & BESS Project

Ark Energy Appoints Elecnor as ECI Contractor for Richmond Valley Solar & BESS Project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

I agree to the Terms & Conditions and Privacy Policy.

Stay Connected

Join our newsletter!

Newsletter

Newsletter

Stay at the front of the construction industry with the latest news, market trends, and project insights — delivered by ConstructionFront.com

Name
Enter your email address
LinkedIn Twitter Youtube Instagram Facebook Flirk

All about the construction world: the latest industry news and trends, practical knowledge, and unique tips to help you on your projects.

Site Map

  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources
  • Contact Us
  • About us

Recent Posts

Red Oak Campus - Data Centre Map

DataBank secures $2 billion financing for Red Oak data centres in Dallas

April,2026
pre_construction_services_contract_infographic_900x600pre_construction_services_contract_infographic_900x600

HowĀ aĀ Pre-ConstructionĀ ServicesĀ Contract (PCSA) Works (AndĀ WhenĀ toĀ UseĀ It)?

April,2026

Copyright Ā© 2023 ConstructionFront.Com | Affiliate Disclosure | Privacy Policy | Terms & Conditions

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
  • Engineering
  • Knowledge Hub
  • Resources

Copyright Ā© 2023 ConstructionFront.Com | Affiliate Disclosure | Privacy Policy | Terms & Conditions

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.

ConstructionFront.com - Newsletter!

Stay at the front of the construction industry with the latest news, market trends, and project insights — delivered by ConstructionFront.com

Name
Enter your email address

Thanks, I’m not interested

Privacy Policy - Terms and Conditions