Construction is known for its challenging nature – unexpected hurdles can often arise, leading to delays, budget overruns, frustration, and disputes between contractors and owners.
Among the unexpected issues, latent conditions emerge as one of the major concerns for all parties involved in a project. But what is it?
Latent conditions are hidden construction issues or conditions that emerge after work begins (or after contract execution), which may lead to construction program disruptions and increased costs.
In this article, we will explore the concept of latent conditions further, as well as the best strategies to deal with it and detail some practical examples. Keep reading it!
What is a Latent Condition?
Within construction law, a latent condition typically refers to an unanticipated problem that becomes evident only after construction activities have commenced or after contract execution.
Unlike apparent defects or conditions that can be reasonably detected during pre-construction inspections or identified in tendering documents, latent conditions remain hidden from view until work is underway. Some examples include soil instability, buried utilities, environmental factors, or hidden structural defects not previously identified.
These hidden challenges often lead to significant disruptions in the construction process and, very often, to disputes between Contractors and Owners.
Latent Conditions - Examples
The list and table below provide some examples of common latent condition that might be encountered, such as:
- Asbestos
- Unforeseen Utilities
- Soil Contamination
- Hidden Structural Issues
- Unexpected Geotechnical Conditions
- Water/Infiltration issues
- Hidden Pest Infestations
- Unseen Environmental Restrictions
Latent Condition Example | Description |
Undiscovered Asbestos Insulation | During renovations, hidden asbestos insulation is found within walls, requiring specialized removal. |
Unforeseen Utility Lines | While digging for foundations, unexpected utility lines are encountered, necessitating rerouting. |
Soil Contamination | Soil analysis reveals previously unseen contaminants, demanding remediation before construction. |
Hidden Structural Weaknesses | Latent conditions expose concealed structural defects in building components, affecting stability. |
Unexpected Rock Formations | Excavation uncovers hidden rock formations, delaying foundation work and requiring adjustments. |
Concealed Water Damage | Behind walls, hidden water damage is discovered, prompting repairs to prevent further deterioration. |
Structural Erosion | Unanticipated soil erosion beneath a structure leads to potential foundation instability. |
Hidden Pest Infestations | Concealed pest infestations, such as termites or rodents, are found, necessitating extermination. |
Soil Shifting | Latent conditions reveal unexpected soil shifting that affects grading and landscape planning. |
Environmental Restrictions | After construction begins, previously unnoticed environmental restrictions are unveiled. |
The "Competent Contractor" Test in Latent Condition Evaluation
The competent contractor test plays a crucial role in navigating latent – this assessment gauges whether a skilled contractor (aka “experienced” or “competent” contractor) could reasonably anticipate a latent condition before project commencement.
Modern construction contracts include clauses and definitions to specifically deal with these issues. However, there are emblematic legal cases around latent conditions, such as Obrascon Huarte Lain SA (OHL) v Her Majesty’s Attorney General for Gibraltar, which involved issues related to unforeseen soil contamination.
An example of a contractual definition for latent condition is:
“Latent Condition means physical conditions of the Site which differ materially from the physical conditions which should reasonably have been anticipated by a Competent Contractor” (adapted from Lawinsider.com)
As expected, this topic is very sensitive from a legal perspective, and many different interpretations may arise concerning to the definitions of a “competent contractor” and what it should reasonably anticipate.
Who bears the Latent Condition Risks - Contractor or Principal (Owner)?
It depends, and different contracts have different approaches based on the project risk profile and the parties involved.
Typically, contractors accept the site conditions (check FAQ section for site condition definition) and bear the burden of unforeseen situations. The rationale is that the Principal/Owner engages the Contractor based on expertise and experience, and the Contractor is better positioned to identify, price, and manage these risks.
However, in some cases, tight procurement timelines and insufficient details during tendering processes might shift the risk profile, and Owners might ultimately bear these risks.
Ultimately, risk allocation should consider:
- Site Conditions
- Available Site Information and Investigations at the time of procurement and contract execution
To protect themselves, Principals usually provide an extensive documentation suit while refraining from offering a warranty on its accuracy.
Very commonly, contracts and tendering documents clearly state the contractor’s responsibility to conduct independent site investigations and verify any site-related information supplied by the Principal.
As expected, this topic is very sensitive from a legal perspective, and many different interpretations may arise concerning to the definitions of a “competent contractor” and what it should reasonably anticipate.
How to Manage Latent Condition Risks?
Mitigating latent condition risks should comment before procurement and continue throughout project delivery. The next tables detail some indicative measures to mitigate and manage latent condition risks.
Latent Condition - Risk Mitigation Initiatives during Project Procurement
The table below summarises some potential inatives to mitigate latent risks during project tendering. In this phase, measures can be considered as preventive.
Procurement Phase | Preventive Measures |
Site Investigations and Feasibility Studies | Engage experts like engineers, geologists, and surveyors to assess potential challenges hidden within the construction site. |
Clear Contractual Language | Draft contracts with well-defined clauses addressing latent conditions, risk allocation, and procedures for dispute resolution. |
Comprehensive Pre-Bid Meetings | Hold meetings to discuss latent condition risks with prospective contractors, promoting a better understanding of the project’s challenges. |
Pre-Qualification of Contractors | Ensure contractors have the necessary expertise and experience to handle potential latent condition challenges during the project. |
Risk Assessment and Adequate Allocation | Evaluate latent condition risks and allocate responsibilities based on the level of foreseeability and the ability to address these issues |
Contingency Planning in Budget | Allocate a portion of the budget as contingency funds to address unforeseen latent conditions that might arise during construction. |
Collaboration with Legal Experts | Consult construction law experts during the contract drafting phase to ensure the incorporation of fair and clear clauses related to latent conditions. |
Collaboration with Insurance Experts | Engage with insurance professionals to determine the scope of coverage for latent condition-related risks and potential insurance claims. |
Detailed Documentation of Site Assessments | Maintain detailed records of site investigations and feasibility studies, outlining the identified latent condition risks and their potential impact. |
Latent Condition - Risk Mitigation Initiatives During Construction Phase
Throughout the construction phase, the initiatives detailed below take on a ‘corrective’ role, as Contractors and Owners may have already confronted the latent condition issue on-site
Delivery Phase | Initiatives |
Transparent Communication Among Stakeholders | Maintain open dialogue (both informal and formal – i.e. notices) between contractors subcontractors, and project owners to foster collaboration and swift responses to latent conditions. |
Detailed Documentation of Latent Conditions | Document the discovery, impact, and resolution of latent conditions thoroughly, creating a clear record for dispute resolution and cost allocation. |
On-Site Monitoring, Recording and Assessment | Employ construction managers or experts for on-site monitoring, enabling swift identification, recording and assessment of latent conditions as they emerge. |
Engaging Legal Counsel, Engineers and Advisors for Complex Cases | Seek expert advice in situations involving disputes or complex legal implications, ensuring adherence to contractual terms and proper risk allocation. |
Revisiting Contractual Clauses and Requirements | Review contract clauses related to latent conditions and ensured contract requirements are met, especially if cost and time relief will be sought. |
How to contractually deal with Latent Conditions?
Contractors will typically seek cost and time recovery when encountering latent conditions. Even though each construction agreement has different requirements, the following notices are very standard:
- Early Warning Notice – Contractual notifications issued proactively identify, mitigate and address potential risks or issues in a construction project, such as cost increases and program delays (usually condition precedent to Variation Claims and EOTs).
For More details, read What is an Early Warning Notice? (Click Here)
- Variation Claim (Cost Recovery) – Contractual Notices by which Contractors seek cost relief arising from any issues.
For More details, read What is a Variation Request/Claim? (Click Here)
- Extension of Time Claim or EOTs (Time Recovery) – Refers to a formal request made seeking an extension of the project’s completion date or any other milestone date specified in the contract.
For More details, read What is an Extension of Time Claim? (Click Here)
Ensure that you read your agreement carefully and comply with the required timelines in order to avoid time-bar issues.
FAQ
What Are Site Conditions?
Site conditions are all the physical, environmental, and geological aspects of a construction site. A thorough understanding of these conditions is mandatory for accurate project planning, precise risk assessment and allocation, and budgeting.
Is Latent Condition and Latent Defect the Same?
No, they are distinct concepts. A latent condition refers to an unforeseen issue uncovered during construction.
On the other hand, a latent defect is a concealed problem that surfaces after the project’s completion, impacting the structure integrity or asset functionality over time.
Conclusion
As shown, latent conditions are unanticipated complications linked to construction projects. Unlike detectable problems, they remain hidden until work is underway and, when encountered, might lead to significant cost overruns and project delays.
The management of latent conditions should start during the project conception and procurement phases, with measures like site investigations and clear contracts preempting risks.
If unforeseen conditions are faced, project parties should rely on transparent communication and ensure contract compliance to address issues successfully.
Need Help?
Do not hesitate to contact us for specialised advice in construction contracts (click here)